A New Bottleneck-Based Heuristic for Reentrant Job Shops: A Case Study in a Textile Factory
From MaRDI portal
Publication:5392012
Recommendations
- Heuristics for the two-stage job shop scheduling problem with a bottleneck machine
- scientific article; zbMATH DE number 1271322
- Cyclic scheduling heuristics for a re-entrant job shop manufacturing environment
- An efficient heuristic approach to the scheduling of jobs in a flowshop
- A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops
- Heuristic algorithms for two machine re-entrant flow shop
- A DBR scheduling method for manufacturing environments with bottleneck re-entrant flows
- Modeling the reentrant job shop scheduling problem with setups for metaheuristic searches
- An improved shifting bottleneck procedure for the job shop scheduling problem
- On the connection between a cyclic job shop and a reentrant flow shop scheduling problem
Cited in
(3)
This page was built for publication: A New Bottleneck-Based Heuristic for Reentrant Job Shops: A Case Study in a Textile Factory
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5392012)