The value of the shortest loop covering all work centers in a manufacturing facility layout
From MaRDI portal
Publication:5444635
Recommendations
- Covering and connectivity constraints in loop-based formulation of material flow network design in facility layout
- Exact and heuristic procedures for the material handling circular flow path design problem
- Configuring layout in unidirectional loop manufacturing systems
- The significance of deterministic empty vehicle trips in the design of a unidirectional loop flow path
- Flow network design for manufacturing systems layout
Cites work
- A practical exact algorithm for the shortest loop design problem in a block layout
- An integrated approach for the concurrent determination of the block layout and the input and output point locations based on the contour distance
- Complexity of the AGV shortest path and single-loop guide path layout problems
- Flow network design for manufacturing systems layout
- Heuristic dispatching models for multi-vehicle materials handling systems
- Impact of empty vehicle flow on optimal flow path design for unidirectional AGV systems
- Loop based facility planning and material handling
- Modelling empty vehicle traffic in AGVS design
- Network configuration and machine layout in fixed-path material handling systems
- Some Applications of the Generalized Travelling Salesman Problem
Cited in
(7)- A practical exact algorithm for the shortest loop design problem in a block layout
- Covering and connectivity constraints in loop-based formulation of material flow network design in facility layout
- Exact and heuristic procedures for the material handling circular flow path design problem
- Improved formulation, branch-and-cut and tabu search heuristic for single loop material flow system design
- Loop based facility planning and material handling
- Unidirectional circular layout for overhead material handling systems
- Designing flexible loop-based material handling AGV paths with cell-adjacency priorities: an efficient cutting-plane algorithm
This page was built for publication: The value of the shortest loop covering all work centers in a manufacturing facility layout
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5444635)