scientific article; zbMATH DE number 5049964
From MaRDI portal
Publication:5482513
Recommendations
- Hybrid heuristics for the capacitated lot sizing and loading problem with setup times and overtime decisions
- The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
- Fix-and-optimize heuristics for capacitated lot-sizing with sequence-dependent setups and substitutions
- Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups
- A heuristic procedure for the capacitated lot sizing problem with setup carry-over
- A capacitated lot sizing problem with stochastic setup times and overtime
- MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups
- Capacitated lot-sizing with sequence dependent setup costs
- A note on ``the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
- Capacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integration
Cited in
(8)- Hybrid heuristics for the capacitated lot sizing and loading problem with setup times and overtime decisions
- A capacitated lot sizing problem with stochastic setup times and overtime
- A heuristic procedure for the capacitated lot sizing problem with setup carry-over
- A tabu-search heuristic for the capacitated lot-sizing problem with set-up carryover
- A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over
- Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups
- Capacitated lot sizing with alternative routings and overtime decisions
- The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5482513)