Some dominance properties for single-machine tardiness problems with sequence-dependent setup
DOI10.1080/00207540500543257zbMATH Open1094.90017OpenAlexW2069933763WikidataQ57185933 ScholiaQ57185933MaRDI QIDQ5485050FDOQ5485050
Authors: Xiaochuan Luo, Chengbin Chu, Chengen Wang
Publication date: 28 August 2006
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540500543257
Recommendations
- Dominance rules for single machine schedule with sequence dependent setup and due date
- A branch and bound algorithm of the single machine schedule with sequence dependent setup times for minimizing total tardiness
- A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness
- Un nouveau concept de dominance pour l'ordonnancement de travaux sur une machine
- New results for single-machine scheduling with past-sequence-dependent setup times and due date-related objectives
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Scheduling in a sequence dependent setup environment with genetic search
- Earliness-tardiness scheduling with setup considerations
- A branch-and-bound algorithm for the early/tardy machine scheduling problem with a common due-date and sequence-dependent setup time
- Construction heuristics for the asymmetric TSP.
Cited In (7)
- The third comprehensive survey on scheduling problems with setup times/costs
- A BB\&R algorithm for minimizing total tardiness on a single machine with sequence dependent setup times
- A branch and bound algorithm of the single machine schedule with sequence dependent setup times for minimizing total tardiness
- A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness
- Dominance rules for single machine schedule with sequence dependent setup and due date
- A multi-objective optimization for preemptive identical parallel machines scheduling problem
- Solving the single crane scheduling problem at rail transshipment yards
This page was built for publication: Some dominance properties for single-machine tardiness problems with sequence-dependent setup
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5485050)