Scheduling contractors' farm‐to‐farm crop harvesting operations
From MaRDI portal
Publication:5488239
DOI10.1111/j.1475-3995.2006.00530.xzbMath1127.90350MaRDI QIDQ5488239
Les R. Foulds, C. B. Basnet, John M. Wilson
Publication date: 14 September 2006
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1111/j.1475-3995.2006.00530.x
90C10: Integer programming
90B35: Deterministic scheduling theory in operations research
90C59: Approximation methods and heuristics in mathematical programming
Related Items
Optimal working time distribution and routing for autonomous tractors based on heuristic algorithms, The traveling salesman problem with job-times (\textit{TSPJ}), Cutting uncertain stock and vehicle routing in a sustainability forestry harvesting problem
Cites Work
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
- Optimal resource leveling using non-serial dynamic programming
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Applying tabu search to the job-shop scheduling problem
- Solving real-life vehicle routing problems efficiently using tabu search
- A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints