An integrated cost model for production scheduling and perfect maintenance
DOI10.1504/IJMOR.2011.040875zbMATH Open1217.90105MaRDI QIDQ553937FDOQ553937
Authors: Laith A. Hadidi, U. Al-Turki, Md. Abdur Rahim
Publication date: 28 July 2011
Published in: International Journal of Mathematics in Operational Research (Search for Journal in Brave)
Recommendations
- Joint job scheduling and preventive maintenance on a single machine
- Joint production and preventive maintenance scheduling for a single degraded machine by considering machine failures
- Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process
- Simultaneous scheduling of production and preventive maintenance on a single machine
- Two-machine flow shop scheduling integrated with preventive maintenance planning
preventive maintenanceproduction schedulingjob sequencingintegrated modelscost modelsdeteriorating production processesunreliable machine
Reliability, availability, maintenance, inspection in operations research (90B25) Deterministic scheduling theory in operations research (90B35)
Cited In (11)
- An Integrated Cost Model for the Joint Optimization of Process Control and Maintenance
- Simultaneous scheduling of production and preventive maintenance on a single machine
- Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process
- Integrated model of single-machine scheduling and maintenance decision for degrading state systems
- A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines
- Two-machine flow shop scheduling integrated with preventive maintenance planning
- Data-driven integrated production and maintenance optimization
- Joint production and preventive maintenance scheduling for a single degraded machine by considering machine failures
- Integrating production scheduling and preventive maintenance for a single machine with due window
- Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem
- Joint job scheduling and preventive maintenance on a single machine
This page was built for publication: An integrated cost model for production scheduling and perfect maintenance
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q553937)