scientific article; zbMATH DE number 3298499
From MaRDI portal
Publication:5578718
Recommendations
- Scheduling Cyclic Production on Several Identical Machines
- Modelling and scheduling a batch-type production on identical machines
- Scheduling problems on two sets of identical machines
- Production scheduling of independent jobs on parallel identical processors
- On a problem of production scheduling
- Production scheduling with complex precedence constraints in parallel machines
- Scheduling the production of two-component jobs on a single machine
- Scheduling identical parallel machines with tooling constraints
- Optimization of identical jobs production on the base of cyclic schedules
Cited in
(7)- A branch and bound algorithm for extreme point mathematical programming problems
- A finite procedure to generate feasible points for the extreme point mathematical programming problem
- Enumerative technique for an extreme point fractional program
- Extreme point programming with nonlinear constraints
- Scheduling the Production of Several Items with Random Demands in a Single Facility
- An extreme-point-ranking algorithm for the extreme-point mathematical programming problem
- A primal like algorithm for extreme point fuzzy mathematical programming problem
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5578718)