Scheduling identical parallel machines with tooling constraints
From MaRDI portal
Recommendations
- Parallel machine scheduling with tool loading
- Identical parallel machine scheduling with time-dependent processing times
- Identical parallel machine rescheduling under complex restrictions
- Scheduling on parallel identical machines to minimize total tardiness
- Scheduling identical parallel machines to minimize total weighted completion time
- scientific article; zbMATH DE number 4164535
- Scheduling identical jobs on uniform parallel machines
- Scheduling identical parallel machines with a fixed number of delivery dates
- Rescheduling of identical parallel machines under machine eligibility constraints.
Cites work
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- scientific article; zbMATH DE number 846900 (Why is no real title available?)
- A Branch and Bound Approach for Machine Load Balancing in Flexible Manufacturing Systems
- A Survey of Scheduling Rules
- A divide and merge heuristic for the multiprocessor scheduling problem with sequence dependent setup times
- A general heuristic for vehicle routing problems
- A hybrid adaptive large neighborhood search heuristic for lot-sizing with setup times
- A modified LPT algorithm for the two uniform parallel machine makespan minimization problem
- A note on parallel machine scheduling with non-simultaneous machine available time
- A survey of scheduling problems with setup times or costs
- An Application of Bin-Packing to Multiprocessor Scheduling
- An adaptive large neighborhood search heuristic for the cumulative capacitated vehicle routing problem
- An adaptive large neighborhood search heuristic for the pollution-routing problem
- An adaptive large neighborhood search heuristic for two-echelon vehicle routing problems arising in city logistics
- An improved tabu search approach for solving the job shop scheduling problem with tooling constraints
- Auxiliary tool allocation in flexible manufacturing systems
- Combinatorial optimization models for production scheduling in automated manufacturing systems
- Due date and cost-based FMS loading, scheduling and tool management
- Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
- Heuristic procedures for the parallel machine problem with tool switches
- Heuristic scheduling of parallel machines with sequence-dependent set-up times
- Hybrid method with CS and BRKGA applied to the minimization of tool switches problem
- Improved integer linear programming formulations for the job sequencing and tool switching problem
- Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches
- Multiprocessor scheduling: Combining LPT and MULTIFIT
- Parallel machines scheduling with nonsimultaneous machine available time
- Solving the job sequencing and tool switching problem as a nonlinear least cost Hamiltonian cycle problem
- The effect of machine availability on the worst-case performance of LPT
- The scheduling problem of PCBs for multiple non-identical parallel machines
- The third comprehensive survey on scheduling problems with setup times/costs
- Tool planning models for flexible manufacturing systems
Cited in
(20)- An iterated local search procedure for the job sequencing and tool switching problem with non-identical parallel machines
- An ALNS to optimize makespan subject to total completion time for no-wait flow shops with sequence-dependent setup times
- Novel formulations and logic-based Benders decomposition for the integrated parallel machine scheduling and location problem
- Unsupervised parallel machines scheduling with tool switches
- Production scheduling decision-making technology for multiple CNC machining centers with constraints on serviceable time
- Predictive-reactive strategy for identical parallel machine rescheduling
- Parallel machine scheduling with tool loading
- Application of a hybrid evolutionary algorithm to resource-constrained parallel machine scheduling with setup times
- Biased random-key genetic algorithm for the job sequencing and tool switching problem with non-identical parallel machines
- Unrelated parallel batch processing machine scheduling with time requirements and two-dimensional packing constraints
- A simple and effective hybrid genetic search for the job sequencing and tool switching problem
- Improved heuristic algorithms for the job sequencing and tool switching problem
- Minimizing the makespan on two identical parallel machines with mold constraints
- scientific article; zbMATH DE number 3298499 (Why is no real title available?)
- A matheuristic for parallel machine scheduling with tool replacements
- Scheduling a maintenance activity on parallel identical machines
- Biased random-key genetic algorithm for scheduling identical parallel machines with tooling constraints
- Exploiting symmetry for the job sequencing and tool switching problem
- Heuristic procedures for the parallel machine problem with tool switches
- Scheduling unrelated additive manufacturing machines with practical constraints
This page was built for publication: Scheduling identical parallel machines with tooling constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1752870)