An Evaluator for the Number of Operationally Ready Aircraft in a Multilevel Supply System
From MaRDI portal
Publication:5615799
DOI10.1287/opre.19.3.618zbMath0213.45501OpenAlexW2117124975MaRDI QIDQ5615799
Publication date: 1971
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.19.3.618
Related Items (14)
Multi-item spare parts systems with lateral transshipments and waiting time constraints ⋮ Approximate steady-state distribution for a large repairable item inventory system ⋮ Last time buy and repair decisions for spare parts ⋮ Spare parts inventory and cycle time reduction ⋮ Finite inventory budgets in production capacity and safety stock placement under the guaranteed service approach ⋮ A spare parts model with cold-standby redundancy on system level ⋮ Inventory allocation among an assembly and its repairable subassemblies ⋮ Markov process modelling of a maintenance system with spares, repair, cannibalization and manpower constraints ⋮ An inventory sharing and allocation method for a multi-location service parts logistics network with time-based service levels ⋮ Steady-state approximations for multi-echelon multi-indentured repairable-item inventory system ⋮ Optimal maintenance decision for line reparable units (LRU's) for an aircraft system -- a conceptual approach ⋮ Multi-echelon systems: A service measure perspective ⋮ Repairable inventory theory: Models and applications ⋮ Optimal replacement policy for multicomponent systems: An application to a dairy herd
This page was built for publication: An Evaluator for the Number of Operationally Ready Aircraft in a Multilevel Supply System