Last time buy and repair decisions for spare parts
From MaRDI portal
Publication:319389
DOI10.1016/J.EJOR.2015.02.003zbMath1346.90013OpenAlexW2086834950MaRDI QIDQ319389
S. Behfard, A. Al Hanbali, W. Henk M. Zijm, Matthieu C. van~der Heijden
Publication date: 6 October 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://research.utwente.nl/en/publications/last-time-buy-and-repair-decisions-for-spare-parts(d33aa856-3ab8-487a-b0f7-0011b377e17e).html
Related Items (6)
A survey of maintenance and service logistics management: classification and research agenda from a maritime sector perspective ⋮ Spare parts classification in industrial manufacturing using the dominance-based rough set approach ⋮ Optimal inventory control and design refresh selection in managing part obsolescence ⋮ The role of part failure rates asymmetry and spare part proprietariness on remanufacturing decision making ⋮ An exact static solution approach for the service parts end-of-life inventory problem ⋮ OR in spare parts management: a review
Cites Work
- Unnamed Item
- Renewal theory forecasting for stock control
- End-of-life service: A case study
- The `final order' problem
- Inventory control of service parts in the final phase
- A non-stationary periodic review production-inventory model with uncertain production capacity and uncertain demand
- Last time buy decisions for products sold under warranty
- Modeling sourcing strategies to mitigate part obsolescence
- Decision support for spare parts acquisition in post product life cycle
- Fitting Discrete Distributions on the First Two Moments
- The final order problem for repairable spare parts under condemnation
- An Inventory Model with Limited Production Capacity and Uncertain Demands I. The Average-Cost Criterion
- An Evaluator for the Number of Operationally Ready Aircraft in a Multilevel Supply System
- Analysis and Algorithms for Service Parts Supply Chains
- The Structure of Periodic Review Policies in the Presence of Random Yield
This page was built for publication: Last time buy and repair decisions for spare parts