Lot sizing when yields increase during the production run
From MaRDI portal
Publication:5690155
DOI10.1002/(SICI)1520-6750(199612)43:8%3C1035::AID-NAV1%3E3.0.CO;2-FzbMATH Open0864.90054OpenAlexW2082969019MaRDI QIDQ5690155FDOQ5690155
Authors: Karla E. Bourland, Candace Arai Yano
Publication date: 15 January 1997
Full work available at URL: https://doi.org/10.1002/(sici)1520-6750(199612)43:8%3C1035::aid-nav1%3E3.0.co;2-f
Recommendations
- Algorithms and heuristics for variable-yield lot sizing
- Multistage production systems with random yield: heuristics and optimality
- Optimal Lot Sizes with Geometric Production Yield and Rigid Demand
- Lot sizes in serial manufacturing with random yields
- Lot sizing with random yields and tardiness costs
heuristicLagrangian relaxationsetup costsinventory holding costslot sizes for multiple itemstotal cost of production
Cited In (4)
This page was built for publication: Lot sizing when yields increase during the production run
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5690155)