Minimising mean tardiness with alternative operations in two-machine flow-shop scheduling
From MaRDI portal
Publication:5712093
DOI10.1080/00207720500219237zbMath1122.90039OpenAlexW2039773138MaRDI QIDQ5712093
Jen-Shiang Chen, Jason Chao-Hsien Pan
Publication date: 22 December 2005
Published in: International Journal of Systems Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207720500219237
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (3)
On bills of materials structure and optimum product-level smoothing of parts usage in JIT assembly systems ⋮ Computing lower and upper bounds for a large-scale industrial job shop scheduling problem ⋮ Single machine total completion time minimization scheduling with a time-dependent learning effect and deteriorating jobs
Cites Work
This page was built for publication: Minimising mean tardiness with alternative operations in two-machine flow-shop scheduling