Scheduling projects with labor constraints
From MaRDI portal
Publication:5946815
DOI10.1016/S0166-218X(00)00308-5zbMath0984.90012MaRDI QIDQ5946815
Yinhua Wang, Laurence A. Wolsey, Cid Carvalho De Souza, Savelsbergh, Martin W. P., Cristina C. B. Cavalcante
Publication date: 27 February 2002
Published in: Discrete Applied Mathematics (Search for Journal in Brave)
integer programminglocal searchtabu search algorithmbranch-and-prune algorithmlabor constrained scheduling problemlinear relaxationLP-based ordering heuristics
Integer programming (90C10) Search theory (90B40) Deterministic scheduling theory in operations research (90B35)
Related Items
A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource, Incremental and encoding formulations for mixed integer programming, A list-scheduling heuristic for the short-term planning of assessment centers, A survey of variants and extensions of the resource-constrained project scheduling problem, A satisfiability and workload-based exact method for the resource constrained project scheduling problem with generalized precedence constraints, Mixed Integer Linear Programming Formulation Techniques, Polyhedral Results and Branch-and-Cut for the Resource Loading Problem, Strong bounds for resource constrained project scheduling: preprocessing and cutting planes
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Scheduling-LPs bear probabilities. Randomized approximations for min-sum criteria
- A time indexed formulation of non-preemptive single machine scheduling problems
- MIP modelling of changeovers in production planning and scheduling problems
- MINTO, a Mixed INTeger Optimizer
- Scheduling under labour resource constraints
- From Ground Holding to Free Flight: An Exact Approach
- Connected and alternating vectors: Polyhedra and algorithms
- Tabu Search—Part I
- Tabu Search—Part II
- Time-Indexed Formulations for Machine Scheduling Problems: Column Generation