Carbon-efficient scheduling problem of electric rubber-tyred gantry cranes in a container terminal
From MaRDI portal
Publication:6094578
DOI10.1080/0305215x.2021.1972293zbMath1523.90149OpenAlexW3200005259MaRDI QIDQ6094578
Qingcheng Zeng, Unnamed Author
Publication date: 10 October 2023
Published in: Engineering Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/0305215x.2021.1972293
Applications of mathematical programming (90C90) Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Effects of storage block layout and automated yard crane systems on the performance of seaport container terminals
- Yard crane scheduling for container storage, retrieval, and relocation
- Discrete time model and algorithms for container yard crane scheduling
- Carbon-efficient deployment of electric rubber-tyred gantry cranes in container terminals with workload uncertainty
- Branch-and-price approaches for the multiperiod technician routing and scheduling problem
- Interblock Crane Deployment in Container Terminals
- Logic-based Benders decomposition for gantry crane scheduling with transferring position constraints in a rail–road container terminal
- Multi-product production routing problem by consideration of outsourcing and carbon emissions: particle swarm optimization
This page was built for publication: Carbon-efficient scheduling problem of electric rubber-tyred gantry cranes in a container terminal