Interblock Crane Deployment in Container Terminals
From MaRDI portal
Publication:4411214
DOI10.1287/trsc.36.1.79.568zbMath1065.90514OpenAlexW2047423057MaRDI QIDQ4411214
Wuqin Lin, Raymond K. Chung, Chung-Lun Li
Publication date: 7 July 2003
Published in: Transportation Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/trsc.36.1.79.568
Related Items (16)
Optimizing the number of deployed yard cranes in a container terminal ⋮ A crane scheduling method for port container terminals ⋮ Allocation of empty containers between multi-ports ⋮ Sequencing dual-spreader crane operations: mathematical formulation and heuristic algorithm ⋮ Carbon-efficient scheduling problem of electric rubber-tyred gantry cranes in a container terminal ⋮ Yard Crane Scheduling in the Ground Trolley-Based Automated Container Terminal ⋮ Carbon-efficient deployment of electric rubber-tyred gantry cranes in container terminals with workload uncertainty ⋮ Effect of block length and yard crane deployment systems on overall performance at a seaport container transshipment terminal ⋮ Optimizing the landside operation of a container terminal ⋮ A branch-and-price algorithm to solve the integrated berth allocation and yard assignment problem in bulk ports ⋮ An exact method for scheduling a yard crane ⋮ Yard crane scheduling in port container terminals ⋮ An optimisation framework for yard planning in a container terminal: Case with automated rail-mounted gantry cranes ⋮ AN EFFICIENT OPTIMAL SOLUTION OF A TWO-CRANE SCHEDULING PROBLEM ⋮ Discrete time model and algorithms for container yard crane scheduling ⋮ A DECISION SUPPORT SYSTEM FOR THE ALLOCATION OF YARD CRANES AND BLOCKS IN CONTAINER TERMINALS
This page was built for publication: Interblock Crane Deployment in Container Terminals