Capacitated dynamic lot-sizing problem with delivery/production time windows
From MaRDI portal
Publication:613340
DOI10.1016/j.orl.2010.04.009zbMath1202.90113OpenAlexW1972731972MaRDI QIDQ613340
Hark-Chin Hwang, Wikrom Jaruphongsa, Sıla Çetinkaya, Chung-Yee Lee
Publication date: 20 December 2010
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.orl.2010.04.009
Related Items (3)
Dual-mode production planning for manufacturing with emission constraints ⋮ Improved Approximation Algorithms for Min-Max and Minimum Vehicle Routing Problems ⋮ Sequential versus integrated optimization: production, location, inventory control, and distribution
Cites Work
- Multi-item lot-sizing with joint set-up costs
- A new dynamic programming algorithm for the single item capacitated dynamic lot size model
- Dynamic lot-sizing problem with demand time windows and container-based transportation cost
- Lot-sizing with production and delivery time windows
- Dynamic lot-sizing model with demand time windows and speculative cost structure
- A two-echelon inventory optimization model with demand time window considerations
- Dynamic Version of the Economic Lot Size Model
- A Dynamic Lot-Sizing Model with Demand Time Windows
- Capacitated Multi-Item Lot-Sizing Problems with Time Windows
- An O(T2) Algorithm for the NI/G/NI/ND Capacitated Lot Size Problem
- Deterministic Production Planning: Algorithms and Complexity
- Computational Complexity of the Capacitated Lot Size Problem
- A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0(n log n) or 0(n) Time
- Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case
- Improved Algorithms for Economic Lot Size Problems
- An O(T3) Algorithm for the Economic Lot-Sizing Problem with Constant Capacities
- Algorithms for capacitated rectangle stabbing and lot sizing with joint set-up costs
- Deterministic Production Planning with Concave Costs and Capacity Constraints
- Dynamic lot‐sizing model with production time windows
- A Deterministic Multi-Period Production Scheduling Model with Backlogging
This page was built for publication: Capacitated dynamic lot-sizing problem with delivery/production time windows