Joint energy capacity and production planning optimization in flow-shop systems
From MaRDI portal
Publication:6135666
DOI10.1016/j.apm.2021.09.036zbMath1525.90219MaRDI QIDQ6135666
Melek Rodoplu, Taha Arbaoui, Alice Yalaoui
Publication date: 25 August 2023
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Related Items (1)
Cites Work
- The economic lot-sizing problem with an emission capacity constraint
- A joint chance-constrained programming approach for the single-item capacitated lot-sizing problem with stochastic demand
- Vehicle routing with probabilistic capacity constraints
- Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system
- Capacitated disassembly scheduling under stochastic yield and demand
- Modeling the shelter site location problem using chance constraints: a case study for Istanbul
- Lot sizing with carbon emission constraints
- Chance-Constrained Programming
- MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups
This page was built for publication: Joint energy capacity and production planning optimization in flow-shop systems