Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: a robust exact decomposition
From MaRDI portal
Publication:6164635
DOI10.1016/j.cor.2023.106251OpenAlexW4366824605MaRDI QIDQ6164635
Tarik Zouadi, V. Raja Sreedharan, Kaoutar Chargui
Publication date: 4 July 2023
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2023.106251
decompositionrobust optimizationberth allocation and quay crane assignment and schedulingrenewable energy capacity
Related Items (1)
Cites Work
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
- Exact methods for the quay crane scheduling problem when tasks are modeled at the single container level
- MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem
- New exact methods for the time-invariant berth allocation and quay crane assignment problem
- The quay crane scheduling problem with non-crossing and safety clearance constraints: an exact solution approach
- Comparing techniques for modelling uncertainty in a maritime inventory routing problem
- Berth allocation and quay crane assignment/scheduling problem under uncertainty: a survey
- An exact robust approach for the integrated berth allocation and quay crane scheduling problem under uncertain arrival times
- The bi-objective pollution-routing problem
- Exact and heuristic methods for the integrated berth allocation and specific time-invariant quay crane assignment problems
- Lagrangian Duality for Robust Problems with Decomposable Functions: The Case of a Robust Inventory Problem
- Joint energy capacity and production planning optimization in flow-shop systems
This page was built for publication: Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: a robust exact decomposition