Combined planning and scheduling in a divergent production system with co-production: a case study in the lumber industry
From MaRDI portal
Publication:632662
DOI10.1016/j.cor.2010.10.013zbMath1208.90051OpenAlexW2078385421MaRDI QIDQ632662
Alain Rousseau, Jean-Marc Frayret, Jonathan Gaudreault, Sophie D'Amours
Publication date: 25 March 2011
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2010.10.013
mathematical programmingconstraint programminganytime algorithmintegrated planning and schedulinglumber industrywood drying and finishing
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items
An exact optimization approach for an integrated process configuration, lot-sizing, and scheduling problem, A branch-and-price algorithm for parallel machine campaign planning under sequence dependent family setups and co-production, Essay on Conceptual Modeling, Analysis and Illustration of Agent-Based Simulations for Distributed Supply Chain Planning, Parallel machine scheduling with time constraints on machine qualifications, Matheuristic for the decentralized factories scheduling problem
Uses Software
Cites Work