Combined planning and scheduling in a divergent production system with co-production: a case study in the lumber industry
From MaRDI portal
(Redirected from Publication:632662)
Recommendations
- Production planning and scheduling for an integrated container company
- An Integrated Model for Job-Shop Planning and Scheduling
- Solving planning and scheduling problems with combined integer and constraint programming
- Principles and Practice of Constraint Programming – CP 2004
- Conceptual models for combined planning and scheduling
Cites work
- A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling.
- Agent-based supply-chain planning in the forest products industry
- Conceptual models for combined planning and scheduling
- Constraint and integer programming. Toward a unified methodology.
- scientific article; zbMATH DE number 1550909 (Why is no real title available?)
- Search and strategies in OPL
Cited in
(7)- An exact optimization approach for an integrated process configuration, lot-sizing, and scheduling problem
- Parallel machine scheduling with time constraints on machine qualifications
- Matheuristic for the decentralized factories scheduling problem
- A branch-and-price algorithm for parallel machine campaign planning under sequence dependent family setups and co-production
- A hybrid VNS approach for the short-term production planning and scheduling: a case study in the pulp and paper industry
- Tactical-operational coordination of a divergent production system with coproduction: the sawmilling challenge
- Essay on Conceptual Modeling, Analysis and Illustration of Agent-Based Simulations for Distributed Supply Chain Planning
This page was built for publication: Combined planning and scheduling in a divergent production system with co-production: a case study in the lumber industry
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q632662)