Improving the scheduling of railway maintenance projects by minimizing passenger delays subject to event requests of railway operators
From MaRDI portal
(Redirected from Publication:6561224)
Cites work
- \(\{ 0,\frac12\}\)-Chvátal-Gomory cuts
- A hybrid constraint programming/mixed integer programming framework for the preventive signaling maintenance crew scheduling problem
- A time indexed formulation of non-preemptive single machine scheduling problems
- Edmonds polytopes and a hierarchy of combinatorial problems
- Finding the K Shortest Loopless Paths in a Network
- Gomory cuts revisited
- Intersection Cuts—A New Type of Cutting Planes for Integer Programming
- Lift-and-project cuts for mixed integer convex programs
- Lift-and-project for mixed 0-1 programming: recent progress
- Lifted cover facets of the 0-1 knapsack polytope with GUB constraints
- Lifted flow cover inequalities for mixed 0-1 integer programs
- Mixing mixed-integer inequalities
- On the \(0/1\) knapsack polytope
- On the facial structure of set packing polyhedra
- On the separation of maximally violated mod-\(k\) cuts
- Optimization by simulated annealing
- Rescheduling rail networks with maintenance disruptions using problem space search
- Scheduling arc maintenance jobs in a network to maximize total flow over time
- Scheduling arc shut downs in a network to maximize flow over time with a bounded number of jobs per time period
- Scheduling of railway track maintenance activities and crews
- Scheduling preventive railway maintenance activities
- Scheduling preventive railway maintenance activities with resource constraints
- Solving Mixed Integer Programming Problems Using Automatic Reformulation
- Technical Note—Facets and Strong Valid Inequalities for Integer Programs
- The Boolean quadratic polytope: Some characteristics, facets and relatives
- Warm start of the primal-dual method applied in the cutting-plane scheme
This page was built for publication: Improving the scheduling of railway maintenance projects by minimizing passenger delays subject to event requests of railway operators
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6561224)