Due-date assignment with acceptable lead-times on parallel machines
From MaRDI portal
(Redirected from Due-date assignment with acceptable lead-times on parallel machines)
Cites work
- A common due-data assignment problem on parallel identical machines
- A general scheme for solving a large set of scheduling problems with rejection in FPT time
- A greedy heuristic for solving scheduling problems with bounded rejection cost
- A Heuristic for Common Due-date Assignment and Job Scheduling on Parallel Machines
- A note: minmax due-date assignment problem with lead-time cost
- A survey of the state-of-the-art of common due date assignment and scheduling research
- A survey on offline scheduling with rejection
- A unified approach for scheduling with convex resource consumption functions using positional penalties
- Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem
- Due date assignments and scheduling a single machine with a general earliness/tardiness cost function
- Minmax due-date assignment on a two-machine flowshop
- Minmax scheduling with acceptable lead-times: extensions to position-dependent processing times, due-window and job rejection
- Minsum scheduling with acceptable lead-times and optional job rejection
- Optimal due date assignment in multi-machine scheduling environments
- Optimal restricted due date assignment in scheduling
- Research on single machine SLK/DIF due window assignment problem with learning effect and deteriorating jobs
- Scheduling of two-machine flowshop with outsourcing lead-time
- Scheduling with competing agents, total late work and job rejection
- Single machine lot scheduling with optional job-rejection
- Single Machine Scheduling with Flow Allowances
- Single machine scheduling with non-availability interval and optional job rejection
- Single machine SLK/DIF due window assignment problem with learning effect and deteriorating jobs
- The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times
- Two due date assignment problems in scheduling a single machine
Cited in
(1)
This page was built for publication: Due-date assignment with acceptable lead-times on parallel machines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6568406)