A reactive iterated greedy algorithm for the no-wait flowshop to minimize total tardiness
From MaRDI portal
Publication:6574085
Recommendations
- A new iterated greedy algorithm for no-idle permutation flowshop scheduling with the total tardiness criterion
- No-wait flowshop scheduling problem with two criteria; total tardiness and makespan
- Minimizing total tardiness in no-wait flowshops
- An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time
- Some heuristics for no-wait flowshops with total tardiness criterion
Cites Work
- A best-of-breed iterated greedy for the permutation flowshop scheduling problem with makespan objective
- A general heuristic for vehicle routing problems
- A new vision of approximate methods for the permutation flowshop to minimise makespan: state-of-the-art and computational evaluation
- A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness
- A reactive GRASP and path relinking for a combined production-distribution problem
- A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
- A survey of scheduling problems with no-wait in process
- An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time
- An update on the comparison of MIP, CP and hybrid approaches for mixed resource allocation and scheduling
- Comparative evaluation of MILP flowshop models
- Computing in operations research using Julia
- Formulations and an adaptive large neighborhood search for just-in-time scheduling of unrelated parallel machines with a common due window
- Iterated greedy algorithms for a complex parallel machine scheduling problem
- Minimising total tardiness in the \(m\)-machine flowshop problem: A review and evaluation of heuristics and metaheuristics
- Minimizing total tardiness in no-wait flowshops
- Mixed integer linear programming and constraint programming models for the online printing shop scheduling problem
- NEH-based heuristics for the permutation flowshop scheduling problem to minimise total tardiness
- New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness
- No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan
- Reactive GRASP for the strip-packing problem
- Reactive GRASP: An Application to a Matrix Decomposition Problem in TDMA Traffic Assignment
- Some heuristics for no-wait flowshops with total tardiness criterion
- Topology of septics with the set of singularities \(\mathbf B_{4,4} \oplus 2\mathbf A_3 \oplus 5\mathbf A_1\) and \(\pi_1\)-equivalent weak Zariski pairs
- Two models for a family of flowshop sequencing problems
This page was built for publication: A reactive iterated greedy algorithm for the no-wait flowshop to minimize total tardiness
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6574085)