Two-machine job shop problem with a single server and sequence-independent non-anticipatory set-up times
From MaRDI portal
Publication:6602333
Recommendations
- Two-machine open shop problem with a single server and set-up time considerations
- Two-machine flow shop problems with a single server
- The two-machine flowshop no-wait scheduling problem with a single server to minimize the total completion time
- Scheduling a single server in a two-machine flow shop
- Scheduling two parallel machines with a single server: the general case
Cites work
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- Complexity results for flow-shop problems with a single server
- Complexity results for parallel machine problems with a single server
- On a two-machine flow-shop scheduling problem with a single server and unit processing times
- Optimal two- and three-stage production schedules with set-up time included
- Scheduling a single server in a two-machine flow shop
- Scheduling for parallel dedicated machines with a single server
- Scheduling the two-machine open shop problem under resource constraints for setting the jobs
- Solving the two-machine open shop problem with a single server with respect to the makespan
- The Complexity of Flowshop and Jobshop Scheduling
- The significance of reducing setup times/setup costs
- The two-machine flowshop no-wait scheduling problem with a single server to minimize the total completion time
- The two-machine flowshop scheduling problem with sequence-independent setup times: new lower bounding strategies
- Two-machine flow shop problems with a single server
- Two-machine open shop problem with a single server and set-up time considerations
Cited in
(1)
This page was built for publication: Two-machine job shop problem with a single server and sequence-independent non-anticipatory set-up times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6602333)