ULD build-up scheduling with dynamic batching in an air freight hub
From MaRDI portal
Publication:6606676
Recommendations
- Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space
- The air-cargo consolidation problem with pivot weight: models and solution methods
- Air cargo scheduling: integrated models and solution procedures
- The workload balancing problem at air cargo terminals
- The air cargo load planning problem -- a consolidated problem definition and literature review on related problems
Cites work
- Freight handling personnel scheduling at air cargo terminals
- Handbook on Scheduling
- Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space
- Stochastic models for air cargo terminal manpower supply planning in long-term operations
- The air cargo load planning problem -- a consolidated problem definition and literature review on related problems
This page was built for publication: ULD build-up scheduling with dynamic batching in an air freight hub
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6606676)