flow shop scheduling problembirandom simulation-based genetic algorithmbirandom variablemulti-objective expected value decision-making model
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Related Items (7)
Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates ⋮ Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects ⋮ Solving non-permutation flow-shop scheduling problem via a novel deep reinforcement learning approach ⋮ A class of multi-objective equilibrium chance maximization model with twofold random phenomenon and its application to hydropower station operation ⋮ A nonlinear multiobjective bilevel model for minimum cost network flow problem in a large-scale construction project ⋮ A discrete time optimal control model with uncertainty for dynamic machine allocation problem and its application to manufacturing and construction industries ⋮ Bi-level multiple mode resource-constrained project scheduling problems under hybrid uncertainty
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Branch and bound algorithm for the flow shop with multiple processors
- Minimizing total completion time in a two-machine flow shop with deteriorating jobs
- Minimizing maximum completion time in a proportionate flow shop with one machine of different speed
- Multi-objective decision making model under fuzzy random environment and its application to inventory problems
- Solving multi-criteria scheduling flow shop problem through compromise programming and satisfaction functions
- A new model for the preemptive earliness-tardiness scheduling problem
- Some scheduling problems with sum-of-processing-times-based and job-position-based learning effects
- Multiple attribute decision making. Methods and applications. A state-of- the-art survey
- A survey of multicriteria optimization or the vector maximum problem. I: 1776-1960
- A genetic algorithm for flowshop sequencing
- Minimizing the weighted number of tardy jobs on a two-machine flow shop.
- Theory and practice of uncertain programming
- Solving multi-objective production scheduling problems using metaheuristics
- Uncertainty theory. An introduction to its axiomatic foundations.
- Some local search algorithms for no-wait flow-shop problem with makespan criterion
- A class of multiobjective linear programming model with fuzzy random coefficients
- A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: weighted mean completion time and weighted mean tardiness
- Optimality and mixed saddle point criteria in multiobjective optimization
- Flowshop scheduling research after five decades
- Customer Scheduling with Incomplete Information
- Optimal two- and three-stage production schedules with setup times included
- Some Numerical Experiments for an M × J Flow Shop and its Decision-Theoretical Aspects
- An Adaptable Scheduling Algorithm for Flexible Flow Lines
- Rough sets
- Ordonnancements à contraintes disjonctives
- Note: Bicriteria scheduling for minimizing flow time and maximum tardiness
- Fuzzy sets
- Fuzzy flexible flow shops at two machine centers for continuous fuzzy domains
- Minimizing tardiness in a two-machine flow-shop