A discrete time optimal control model with uncertainty for dynamic machine allocation problem and its application to manufacturing and construction industries
From MaRDI portal
(Redirected from Publication:693462)
Recommendations
- An optimal control problem for the maintenance of a machine
- Developing a flexible manufacturing control system considering mixed uncertain predictive maintenance model: a simulation-based optimization approach
- Optimal production control in a discrete manufacturing system with unreliable machines and random demands
- Control of production and corrective maintenance rates in a multiple-machine, multiple-product manufacturing system
- Production planning of a failure-prone manufacturing system under different setup scenarios
Cites work
- A class of multi-objective expected value decision-making model with birandom coefficients and its application to flow shop scheduling problem
- A network parallel genetic algorithm for the one machine sequencing problem
- A resource portfolio model for equipment investment and allocation of semiconductor testing industry
- Effects of Warranty Execution on Warranty Reserve Costs
- Fuzzy sets
- Fuzzy variables
- Fuzzy-like multiple objective decision making
- scientific article; zbMATH DE number 193123 (Why is no real title available?)
- Machine reliability and preventive maintenance planning for cellular manufacturing systems
- On the coefficients of variation of uptime and downtime in manufacturing equipment
- Optimal preventive maintenance for equipment with two quality states and general failure time distributions
- Optimal preventive maintenance of leased equipment with corrective minimal repairs
- Replacement Decisions with Maintenance Under Uncertainty: An Imbedded Optimal Control Model
Cited in
(3)- Optimal allocation method of discrete manufacturing resources for demand coordination between suppliers and customers in a fuzzy environment
- A stone resource assignment model under the fuzzy environment
- A nonlinear multiobjective bilevel model for minimum cost network flow problem in a large-scale construction project
This page was built for publication: A discrete time optimal control model with uncertainty for dynamic machine allocation problem and its application to manufacturing and construction industries
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q693462)