Research on construction and application for the model of multistage job shop scheduling problem
From MaRDI portal
Publication:782293
DOI10.1155/2020/6357394zbMATH Open1459.90110OpenAlexW3038311750MaRDI QIDQ782293FDOQ782293
Authors: Jianzhong Xu, Song Zhang, Yu-zhen Hu
Publication date: 23 July 2020
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2020/6357394
Recommendations
- Research on multi-stage hybrid flow shop scheduling problem with learning effect
- Dispatching algorithm for production programming of flexible job-shop systems in the smart factory industry
- Scheduling multistage hybrid flowshops with multiprocessor tasks by an effective heuristic
- Two-stage flow-open shop scheduling problem to minimize makespan
- scientific article; zbMATH DE number 1839624
Cites Work
- Optimal two- and three-stage production schedules with set-up time included
- Bounds for Certain Multiprocessing Anomalies
- Bounds on Multiprocessing Timing Anomalies
- A biased‐randomized iterated local search for the distributed assembly permutation flow‐shop problem
- Enriched metaheuristics for the resource constrained unrelated parallel machine scheduling problem
- A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines
- Single-machine scheduling with job-dependent machine deterioration
- A Review of Production Scheduling
- Minimizing value-at-risk in single-machine scheduling
- Exact and heuristic algorithms for minimizing tardy/lost penalties on a single-machine scheduling problem
- Single-machine scheduling with workload-dependent tool change durations and equal processing time jobs to minimize total completion time
- An application of unrelated parallel machine scheduling with sequence-dependent setups at Vestel Electronics
- A unified view of parallel machine scheduling with interdependent processing rates
- Unary NP-hardness of single-machine scheduling to minimize the total tardiness with deadlines
- An improved particle swarm optimization algorithm to solve hybrid flowshop scheduling problems with the effect of human factors -- a case study
Cited In (4)
- Research for global coordinating method of large equipment scheduling in construction site
- Gonsider the non-structural multi-stage production process scheduling method
- Model and algorithm of staff allocation for flexible production based on work time optimization
- A proposal of web application for the study and resolution of the job shop problem with makespan minimization via mixed integer linear programming
This page was built for publication: Research on construction and application for the model of multistage job shop scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q782293)