A combined SDDP/Benders decomposition approach with a risk-averse surface concept for reservoir operation in long term power generation planning
DOI10.1007/s10479-019-03419-4zbMath1456.90111OpenAlexW2981453040MaRDI QIDQ827142
Andre Luiz Diniz, Debora Dias J. Penna, Maria Elvira P. Maceira, Cesar Luis V. Vasconcellos
Publication date: 6 January 2021
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-019-03419-4
risk aversionBenders decompositionstochastic dual dynamic programmingOR in energylarge-scale linear programmingpower generation planning
Applications of mathematical programming (90C90) Stochastic programming (90C15) Dynamic programming (90C39)
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Stochastic inflow modeling for hydropower scheduling problems
- Risk aversion in multistage stochastic programming: a modeling and algorithmic perspective
- Spatio-temporal hydro forecasting of multireservoir inflows for hydro-thermal scheduling
- Dynamic sampling algorithms for multi-stage stochastic programs with risk aversion
- Evaluating policies in risk-averse multi-stage stochastic programming
- Risk-averse dynamic programming for Markov decision processes
- Analysis of stochastic dual dynamic programming method
- A note on second-order stochastic dominance constraints induced by mixed-integer linear recourse
- On a time consistency concept in risk averse multistage stochastic programming
- A model for dynamic chance constraints in hydro power reservoir management
- Analysis of stochastic problem decomposition algorithms in computational grids
- Partitioning procedures for solving mixed-variables programming problems
- Multi-stage stochastic optimization applied to energy planning
- Cut sharing for multistage stochastic linear programs with interstage dependency
- Scenario cluster Lagrangean decomposition for risk averse in multistage stochastic optimization
- Assessing policy quality in a multistage stochastic program for long-term hydrothermal scheduling
- On the time-consistent stochastic dominance risk averse measure for tactical supply chain planning under uncertainty
- Convergent cutting-plane and partial-sampling algorithm for multistage stochastic linear programs with recourse
- EVPI-based importance sampling solution procedures for multistage stochastic linear programmes on parallel MIMD architectures
- GDDP: Generalized dual dynamic programming theory
- An enhanced decomposition algorithm for multistage stochastic hydroelectric scheduling
- Multivariate value at risk and related topics
- Scenario decomposition of risk-averse multistage stochastic programming problems
- Dynamic consistency for stochastic optimal control problems
- Risk-averse feasible policies for large-scale multistage stochastic linear programs
- Risk neutral and risk averse stochastic dual dynamic programming method
- Stochastic dual dynamic integer programming
- Time consistency and risk averse dynamic decision models: definition, interpretation and practical consequences
- Time-Consistent Decisions and Temporal Decomposition of Coherent Risk Functionals
- Stochastic Programs with First-Order Dominance Constraints Induced by Mixed-Integer Linear Recourse
- Decomposition and Partitioning Methods for Multistage Stochastic Linear Programs
- Optimization with Stochastic Dominance Constraints
- On Solving Multistage Stochastic Programs with Coherent Risk Measures
This page was built for publication: A combined SDDP/Benders decomposition approach with a risk-averse surface concept for reservoir operation in long term power generation planning