Scheduling identical parallel machines and operators within a period based changing mode
From MaRDI portal
Publication:833547
DOI10.1016/J.COR.2009.02.022zbMATH Open1176.90256OpenAlexW2052916058MaRDI QIDQ833547FDOQ833547
Mohammed Zouba, Pierre Baptiste, Djamal Rebaine
Publication date: 14 August 2009
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2009.02.022
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Title not available (Why is that?)
- Title not available (Why is that?)
- A survey of scheduling with controllable processing times
- Bilevel programming applied to the flow shop scheduling problem
- Choosing the Job Sequence and Processing Times to Minimize Total Processing Plus Flow Cost on a Single Machine
- Scheduling identical parallel machines and operators within a period based changing mode
- Simultaneous job scheduling and resource allocation on parallel machines
- Unrelated Parallel Machine Scheduling with Resource Dependent Processing Times
- Scheduling Parallel Manufacturing Cells with Resource Flexibility
Cited In (4)
- FPTAS for the two identical parallel machine problem with a single operator under the free changing mode
- A Multiobjective Optimization Approach to Solve a Parallel Machines Scheduling Problem
- Minimizing resource consumption on uniform parallel machines with a bound on makespan
- Scheduling identical parallel machines and operators within a period based changing mode
This page was built for publication: Scheduling identical parallel machines and operators within a period based changing mode
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q833547)