Bilevel programming applied to the flow shop scheduling problem
From MaRDI portal
Recommendations
- Bilevel programming approach applied to the flow shop scheduling problem under fuzziness
- Constraint programming approach to a bilevel scheduling problem
- scientific article; zbMATH DE number 1247725
- On bilevel machine scheduling problems
- Two-Stage Flowshop Scheduling Problem with Bicriteria
- Bicriteria in a two-stage flowshop scheduling problem.
- A bicriteria flowshop scheduling problem with setup times
- Batch scheduling in a two-stage flexible flow shop problem
- Bicriteria in special flowshop problems
Cites work
- A Branch and Bound Algorithm for the Bilevel Programming Problem
- A Mixed-Integer Goal-Programming Formulation of the Standard Flow-Shop Scheduling Problem
- Minimizing Job Idleness in Deadline Constrained Environments
- Minimizing the Number of Machine Idle Intervals with Minimum Makespan in a Flow-Shop
- Scheduling the Open Shop to Minimize Mean Flow Time
- Two-Level Linear Programming
Cited in
(14)- Single machine adversarial bilevel scheduling problems
- On bilevel machine scheduling problems
- Solving discretely-constrained Nash-Cournot games with an application to power markets
- Integer solutions via goal programming to hierarchical systems.
- Bi-level multi-objective mathematical model for job-shop scheduling: the application of theory of constraints
- An effective bilevel programming approach for the evasive flow capturing location problem
- A bilevel mixed-integer program for critical infrastructure protection planning
- Bilevel adversarial scheduling problem on parallel machines
- Production planning problem with sequence dependent setups as a bilevel programming problem
- Bilevel programming approach applied to the flow shop scheduling problem under fuzziness
- Scheduling identical parallel machines and operators within a period based changing mode
- Constraint programming approach to a bilevel scheduling problem
- Bilevel optimization: theory, algorithms, applications and a bibliography
- P2P B&B and GA for the Flow-Shop Scheduling Problem
This page was built for publication: Bilevel programming applied to the flow shop scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1915962)