A Mixed-Integer Goal-Programming Formulation of the Standard Flow-Shop Scheduling Problem
From MaRDI portal
Recommendations
- A new formulation and solution of the flowshop scheduling problem with no in-process waiting
- scientific article; zbMATH DE number 4093162
- A nonlinear mixed integer goal programming model for the two-machine closed flow shop
- scientific article; zbMATH DE number 3854789
- Mixed binary integer programming formulations for the flow shop scheduling problems. A case study: ISD projects scheduling
Cited in
(22)- A new formulation and solution of the flowshop scheduling problem with no in-process waiting
- A new integer programming formulation for the permutation flowshop problem
- Multiple and bicriteria scheduling: A literature survey
- A nonlinear mixed integer goal programming model for the two-machine closed flow shop
- A multicriteria decision-making approach to university resource allocations and information infrastructure planning
- On the exact solution of the no-wait flow shop problem with due date constraints
- Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisation
- Solving multi-objective production scheduling problems using metaheuristics
- Bilevel programming applied to the flow shop scheduling problem
- A combined branch-and bound and genetic algorithm based approach for a flowshop scheduling problem
- A two-step approach to incorporate cut-off grade and stockpiling in oil sands mine planning optimization framework
- Mixed integer formulation to minimize makespan in a flow shop with batch processing machines
- Multicriteria scheduling problems: a survey
- Mixed-Integer Programming Models for Flowshop Scheduling Problems Minimizing the Total Earliness and Tardiness
- A study of integer programming formulations for scheduling problems
- A real-time order acceptance and scheduling approach for permutation flow shop problems
- An improved particle swarm optimization with decline disturbance index (DDPSO) for multi-objective job-shop scheduling problem
- A mixed integer linear programming model for simultaneous design and scheduling of flowshop plants
- On the Development of a Mixed-Integer Linear Programming Model for the Flowshop Sequencing Problem
- KBSS: A knowledge-based system for scheduling in automated manufacturing
- Mixed binary integer programming formulations for the flow shop scheduling problems. A case study: ISD projects scheduling
- A bicriteria flowshop scheduling with a learning effect
This page was built for publication: A Mixed-Integer Goal-Programming Formulation of the Standard Flow-Shop Scheduling Problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3790927)