On the representation of the one machine sequencing problem in the shifting bottleneck heuristic
DOI10.1016/J.EJOR.2006.07.024zbMATH Open1128.90030OpenAlexW2039874357MaRDI QIDQ879326FDOQ879326
Authors: N. E. Zubov
Publication date: 11 May 2007
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://web.iima.ac.in/assets/snippets/workingpaperpdf/2004-11-01saralm.pdf
Recommendations
- The One-Machine Problem with Delayed Precedence Constraints and its Use in Job Shop Scheduling
- scientific article; zbMATH DE number 1271322
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- The generalized shifting bottleneck procedure
- A SHIFTING BOTTLENECK APPROACH FOR A PARALLEL-MACHINE FLOWSHOP SCHEDULING PROBLEM
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- The one-machine sequencing problem
- Guided local search with shifting bottleneck for job shop scheduling
- A modified shifting bottleneck procedure for job-shop scheduling
- Common due window size and location determination in a single machine scheduling problem
- The One-Machine Problem with Delayed Precedence Constraints and its Use in Job Shop Scheduling
- Single-machine scheduling with a common due window
Cited In (1)
This page was built for publication: On the representation of the one machine sequencing problem in the shifting bottleneck heuristic
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q879326)