Two-machine interval shop scheduling with time lags
From MaRDI portal
Publication:892834
DOI10.1007/S10951-013-0336-YzbMATH Open1328.90063OpenAlexW1979469095MaRDI QIDQ892834FDOQ892834
Authors: Xiandong Zhang, Steef van de Velde
Publication date: 12 November 2015
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-013-0336-y
Recommendations
- Schedule execution for two-machine flow-shop with interval processing times
- Algorithms and Computation
- On-line two-machine job shop scheduling with time lags
- Two-machine flow-shop minimum-length scheduling with interval processing times
- On-line two-machine open shop scheduling with time lags
- SCHEDULING TWO-MACHINE FLOW SHOPS WITH EXACT DELAYS
- Two-machine shop scheduling with zero and unit processing times
- Two-machine flow shop scheduling problems with minimal and maximal delays
- The two-machine flowshop scheduling problem with total tardiness
- Two-machine flowshop scheduling to minimize total tardiness
Deterministic scheduling theory in operations research (90B35) Dynamic programming (90C39) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Cites Work
- Title not available (Why is that?)
- Title not available (Why is that?)
- Scheduling jobs with fixed start and end times
- Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard
- Title not available (Why is that?)
- The complexity of satisfiability problems
- The complexity of theorem-proving procedures
- Interval scheduling: A survey
- Hard tiling problems with simple tiles
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
- Exact and approximation algorithms for the operational fixed interval scheduling problem
- Heuristics for a coupled-operation scheduling problem
- Minimizing the weighted number of tardy jobs on a two-machine flow shop.
- Exact and Approximation Algorithms for the Tactical Fixed Interval Scheduling Problem
- On the Flow-Shop Sequencing Problem with No Wait in Process†
- A branch and bound algorithm to minimize the number of late jobs in a permutation flow-shop
- Sequencing \(n\) jobs on two machines with arbitrary time lags
- Two-machine open shop scheduling with special transportation times
- Polynomial-time approximation schemes for scheduling problems with time lags
Cited In (4)
This page was built for publication: Two-machine interval shop scheduling with time lags
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q892834)