On-line two-machine job shop scheduling with time lags
From MaRDI portal
Publication:763542
DOI10.1016/J.IPL.2010.04.002zbMATH Open1233.68229OpenAlexW2045960358MaRDI QIDQ763542FDOQ763542
Steef van de Velde, Xiandong Zhang
Publication date: 12 March 2012
Published in: Information Processing Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ipl.2010.04.002
Online algorithms; streaming algorithms (68W27) Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Cites Work
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard
- Title not available (Why is that?)
- Tactically delayed versus non-delay scheduling: An experimental investigation
- Shop Problems With Two Machines and Time Lags
- Analysis of heuristics for the UET two-machine flow shop problem with time delays
- On-line two-machine open shop scheduling with time lags
- Job Shop Sequencing Problem on Two Machines with Time Lag Constraints
Cited In (3)
This page was built for publication: On-line two-machine job shop scheduling with time lags
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q763542)