On-line two-machine job shop scheduling with time lags
From MaRDI portal
Publication:763542
Recommendations
Cites work
- scientific article; zbMATH DE number 900396 (Why is no real title available?)
- Analysis of heuristics for the UET two-machine flow shop problem with time delays
- Job Shop Sequencing Problem on Two Machines with Time Lag Constraints
- Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard
- On-line two-machine open shop scheduling with time lags
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Shop Problems With Two Machines and Time Lags
- Tactically delayed versus non-delay scheduling: An experimental investigation
Cited in
(6)- A memetic algorithm for the job-shop with time-lags
- Two-machine interval shop scheduling with time lags
- Minimizing the makespan in a 2-machine flowshop with time lags and setup conditions
- On-line two-machine open shop scheduling with time lags
- On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time
- scientific article; zbMATH DE number 710498 (Why is no real title available?)
This page was built for publication: On-line two-machine job shop scheduling with time lags
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q763542)