Minimizing makespan for multi-spindle head machines with a mobile table
From MaRDI portal
(Redirected from Publication:954031)
Recommendations
- Scheduling flexible manufacturing cells using tabu search
- Solving the serial batching problem in job shop manufacturing systems
- Scheduling Parallel Manufacturing Cells with Resource Flexibility
- Minimizing production flow time in a process and assembly job shop
- Single CNC machine scheduling with controllable processing times to minimize total weighted tardiness
Cites work
- scientific article; zbMATH DE number 1731176 (Why is no real title available?)
- scientific article; zbMATH DE number 1731177 (Why is no real title available?)
- A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families
- A heuristic multi-start decomposition approach for optimal design of serial machining lines
- A special case of transfer lines balancing by graph approach
- Balancing large-scale machining lines with multi-spindle heads using decomposition
- Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
- Makespan minimization in a no-wait flow shop problem with two batching machines
- Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed
- Scheduling a batch-processing machine subject to precedence constraints, release dates and identical processing times
- Scheduling with batching: A review
- Solving a large-scale precedence constrained scheduling problem with elastic jobs using tabu search
- The unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespan
- Three is easy, two is hard: Open shop sum-batch scheduling problem refined
This page was built for publication: Minimizing makespan for multi-spindle head machines with a mobile table
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q954031)