Minimizing makespan for multi-spindle head machines with a mobile table
From MaRDI portal
Publication:954031
DOI10.1016/J.COR.2007.10.010zbMATH Open1163.90489OpenAlexW1972833964MaRDI QIDQ954031FDOQ954031
Authors: Olga Guschinskaya, Alexandre Dolgui, Nikolai Guschinsky, Genrikh Levin
Publication date: 7 November 2008
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2007.10.010
Recommendations
- Scheduling flexible manufacturing cells using tabu search
- Solving the serial batching problem in job shop manufacturing systems
- Scheduling Parallel Manufacturing Cells with Resource Flexibility
- Minimizing production flow time in a process and assembly job shop
- Single CNC machine scheduling with controllable processing times to minimize total weighted tardiness
graph theoryschedulingprecedence constraintsbatch processingcompatibility of jobsexclusion and inclusion constraints
Cites Work
- Scheduling with batching: A review
- The unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespan
- Scheduling a batch-processing machine subject to precedence constraints, release dates and identical processing times
- A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families
- Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
- A special case of transfer lines balancing by graph approach
- A heuristic multi-start decomposition approach for optimal design of serial machining lines
- Solving a large-scale precedence constrained scheduling problem with elastic jobs using tabu search
- Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed
- Title not available (Why is that?)
- Title not available (Why is that?)
- Makespan minimization in a no-wait flow shop problem with two batching machines
- Three is easy, two is hard: Open shop sum-batch scheduling problem refined
- Balancing large-scale machining lines with multi-spindle heads using decomposition
Cited In (1)
This page was built for publication: Minimizing makespan for multi-spindle head machines with a mobile table
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q954031)