Recent developments in scheduling
This paper is a survey of the methods developed for solving intractable scheduling problems. In the first section the authors consider a job shop scheduling problem and its representation by the disjunctive graph model. They give a survey of branch-and-bound algorithms constructed for the job shop problem. Approximation algorithms for this problem are also considered. Here the importance of the local search technique is stressed. The various neighbourhood structures and the resulting efficient tabu search implementations are discussed. The purpose of the second section is to present a class of logical tests called interval capacity consistency tests. These tests have been applied frequently and with great success in branch-and-bound and local search algorithms for solving the job shop problem. The authors also discuss the results on the application of the consistency tests for the resource-constrained project scheduling problem (or so called cumulative scheduling problem). The survey includes about 60 references to the recent publications. For the entire collection see [Zbl 0937.00057].
- New perspectives in scheduling theory
- New challenges in scheduling theory
- New challenges in scheduling theory
- New challenges in scheduling theory
- Current trends in deterministic scheduling
- Recent advances for a classical scheduling problem
- scientific article; zbMATH DE number 4076943
- Special issue on Scheduling
- scientific article; zbMATH DE number 3989090
- Scheduling problems
- New trends in machine scheduling
- A computational study of constraint satisfaction for multiple capacitated job shop scheduling
- A search control for scheduling problems
- Current trends in deterministic scheduling
- A local search framework for industrial test laboratory scheduling
- AN O(n^2 log^2 n) ALGORITHM FOR INPUT-OR-OUTPUT TEST IN DISJUNCTIVE SCHEDULING
- Moving to higher directional scheduling schemes
- scientific article; zbMATH DE number 5209067 (Why is no real title available?)
- Scheduling projects with labor constraints
- Improving branch and bound for jobshop scheduling with constraint propagation
This page was built for publication: Recent developments in scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4494435)