Resource-constrained project scheduling: Computing lower bounds by solving minimum cut problems
From MaRDI portal
Recommendations
- Solving project scheduling problems by minimum cut computations
- Lower bounds for resource-constrained project scheduling problems.
- A linear programming and constraint propagation-based lower bound for the RCPSP
- On linear lower bounds for the resource constrained project scheduling problem.
- scientific article; zbMATH DE number 5132358
Cited in
(20)- Lower bounds for resource-constrained project scheduling problems.
- On linear lower bounds for the resource constrained project scheduling problem.
- A linear programming and constraint propagation-based lower bound for the RCPSP
- A new LP-based lower bound for the cumulative scheduling problem
- An exact composite lower bound strategy for the resource-constrained project scheduling problem
- Redundant cumulative constraints to compute preemptive bounds
- An efficient pseudo-polynomial algorithm for finding a lower bound on the makespan for the resource constrained project scheduling problem
- PERT scheduling with convex cost functions.
- Lagrangian relaxation-based lower bound for resource-constrained modulo scheduling
- Constraint-propagation-based cutting planes: an application to the resource-constrained project scheduling problem
- Solving project scheduling problems by minimum cut computations
- Practical solutions for a dock assignment problem with trailer transportation
- THE LEXICO-BOUNDED FLOW ALGORITHM FOR SOLVING THE MINIMUM COST PROJECT SCHEDULING PROBLEM WITH AN ADDITIONAL LINEAR CONSTRAINT
- scientific article; zbMATH DE number 5132358 (Why is no real title available?)
- An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations
- Reducing the number of paths in a minimized project-network with given bounds on the durations of activities
- Optimization guided lower and upper bounds for the resource investment problem
- On project scheduling with irregular starting time costs
- Scheduling and constraint propagation
- Computing redundant resources for the resource constrained project scheduling problem
This page was built for publication: Resource-constrained project scheduling: Computing lower bounds by solving minimum cut problems