Route-reduction-based dynamic programming for large-scale satellite range scheduling problem
From MaRDI portal
Recommendations
- High-performance technique for satellite range scheduling
- An introduction to optimal satellite range scheduling
- A branch-and-price algorithm for nanosatellite task scheduling to improve mission quality-of-service
- A Lagrangian heuristic for satellite range scheduling with resource constraints
- Optimization-based scheduling for the single-satellite, multi-ground station communication problem
Cites work
- A Lagrangian heuristic for satellite range scheduling with resource constraints
- A reduction dynamic programming algorithm for the bi-objective integer knapsack problem
- Computational performance of basic state reduction based dynamic programming algorithms for bi-objective 0-1 knapsack problems
- Graph colouring approaches for a satellite range scheduling problem
- scientific article; zbMATH DE number 1818892 (Why is no real title available?)
- Multi satellites scheduling algorithm based on task merging mechanism
- On the tractability of satellite range scheduling
- Scheduling space-ground communications for the air force satellite control network
Cited in
(10)- High-performance technique for satellite range scheduling
- Dynamic relay satellite scheduling based on ABC-TOPSIS algorithm
- A branch-and-price algorithm for nanosatellite task scheduling to improve mission quality-of-service
- Optimization-based scheduling for the single-satellite, multi-ground station communication problem
- An introduction to optimal satellite range scheduling
- A Generalized Consistent Neighborhood Search for Satellite Range Scheduling Problems
- Research on resource mapping and scheduling in spatial information virtual networks
- Satellite scheduling problems: a survey of applications in Earth and outer space observation
- Adaptive variable neighborhood search algorithm with Metropolis rule and tabu list for satellite range scheduling problem
- A Lagrangian heuristic for satellite range scheduling with resource constraints
This page was built for publication: Route-reduction-based dynamic programming for large-scale satellite range scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5059256)