Scheduling Flat Graphs
From MaRDI portal
Recommendations
Cited in
(21)- Multiprocessor scheduling and combinatorial configurations
- Scheduling loosely connected task graphs.
- A pumping result for 2-context-free languages
- A Graphical Foundation for Schedules
- Nearly on line scheduling of preemptive independent tasks
- Scheduling jobs in open shops with limited machine availability
- Optimality of HLF for scheduling divide-and-conquer UET task graphs on identical parallel processors
- Scheduling Graphs on Two Processors
- Minimum flow time graph ordering.
- Scheduling with limited machine availability
- Profile Scheduling of Opposing Forests and Level Orders
- Scheduling unit-length jobs with precedence constraints of small height
- Manipulating derivation forests by scheduling techniques
- Scheduling precedence graphs of bounded height
- Hierarchy ofk-context-free languages
- A polynomial algorithm for recognizing the \(\mathcal A\)-order class
- Preemptive scheduling with variable profile, precedence constraints and due dates
- Minimizing the number of machines for minimum length schedules
- Hierarchy of k-context-free languages part 1
- scientific article; zbMATH DE number 1884457 (Why is no real title available?)
- scientific article; zbMATH DE number 4057269 (Why is no real title available?)
This page was built for publication: Scheduling Flat Graphs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3741045)