Scheduling job shop problems with sequence-dependent setup times
From MaRDI portal
Recommendations
- Using genetic algorithms and heuristics for job shop scheduling with sequence-dependent setup times
- A genetic algorithm for the flexible job-shop scheduling problem
- Scheduling in a sequence dependent setup environment with genetic search
- A hybrid genetic algorithm for the job shop scheduling problem
- A genetic algorithm for scheduling open shops with sequence-dependent setup times
Cites work
- scientific article; zbMATH DE number 867338 (Why is no real title available?)
- A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
- A genetic algorithm methodology for complex scheduling problems
- A hybrid genetic algorithm for the job shop scheduling problem
- A survey of scheduling problems with setup times or costs
- An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times
- An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives
- Benchmarks for basic scheduling problems
- Hybrid ant colony optimization and visibility studies applied to a job-shop scheduling problem
- Improved immune algorithm for global numerical optimization and job-shop scheduling problems
- Job shop scheduling with group-dependent setups, finite buffers, and long time horizon
- Job shop scheduling with separable sequence-dependent setups
- Local search genetic algorithms for the job shop scheduling problem
- On the Complexity of Scheduling with Batch Setup Times
- Practical job shop scheduling
- Scheduling flexible flow lines with sequence-dependent setup times
- Scheduling of FMSs with information delays: a simulation study
- Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics
- Using genetic algorithms and heuristics for job shop scheduling with sequence-dependent setup times
Cited in
(24)- Corrigendum to: ``Solving the flexible job shop scheduling problem with sequence-dependent setup times
- A hybrid genetic algorithm for the single machine scheduling problem
- Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs
- scientific article; zbMATH DE number 1301841 (Why is no real title available?)
- Algorithms for the wafer probing scheduling problem with sequence-dependent set-up time and due date restrictions
- Multi-stage stochastic mean-semivariance-CVaR portfolio optimization under transaction costs
- scientific article; zbMATH DE number 7145128 (Why is no real title available?)
- The third comprehensive survey on scheduling problems with setup times/costs
- A MILP model for then-job,M-stage flowshop with sequence dependent set-up times
- Optimal crashing of an activity network with disruptions
- A knowledge-based approach for multi-factory production systems
- A contribution and new heuristics for open shop scheduling
- Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times
- Stochastic sequencing with job families, set-up times, and due dates
- Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates
- Solving the serial batching problem in job shop manufacturing systems
- A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
- A competent memetic algorithm for complex scheduling
- Job Shop Scheduling with Setup Times and Maximal Time-Lags: A Simple Constraint Programming Approach
- Group-shop scheduling with sequence-dependent set-up and transportation times
- Scheduling in a sequence dependent setup environment with genetic search
- Using genetic algorithms and heuristics for job shop scheduling with sequence-dependent setup times
- Schedule generation schemes for the jop-shop problem with sequence-dependent setup times: dominance properties and computational analysis
- Metaheuristic algorithm for solving biobjective possibility planning model of location-allocation in disaster relief logistics
This page was built for publication: Scheduling job shop problems with sequence-dependent setup times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3055268)