Scheduling permutation flow shops using the Lagrangian relaxation technique
From MaRDI portal
Recommendations
- scientific article; zbMATH DE number 1301847
- Permutation flowshop scheduling problems with maximal and minimal time lags
- Permutation flow shops with exact time lags to minimise maximum lateness
- An alternative framework to Lagrangian relaxation approach for job shop scheduling.
- Lexicographic optimization of a permutation flow shop scheduling problem with time lag constraints
Cited in
(6)- Scheduling job shops with batch machines using the Lagrangian relaxation technique
- A new Lagrangian relaxation algorithm for hybrid flowshop scheduling to minimize total weighted completion time
- scientific article; zbMATH DE number 1301847 (Why is no real title available?)
- scientific article; zbMATH DE number 232391 (Why is no real title available?)
- A systematic review of permutation flow shop scheduling with due-date-related objectives
- Scheduling a hybrid flowshop with batch production at the last stage
This page was built for publication: Scheduling permutation flow shops using the Lagrangian relaxation technique
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1374432)