Semiconductor manufacturing scheduling and dispatching
From MaRDI portal
Recommendations
- Selection of dispatching rules on multiple dispatching decision points in real-time scheduling of a semiconductor wafer fabrication system
- Multiple-objective scheduling and real-time dispatching for the semiconductor manufacturing system
- Modelling and analysis of wafer fabrication scheduling via generalized stochastic Petri net and simulated annealing
- Integration of scheduling and advanced process control in semiconductor manufacturing: review and outlook
- A simulation study of new multi-objective composite dispatching rules, CONWIP, and push lot release in semiconductor fabrication
Cited in
(15)- Rule-based scheduling in wafer fabrication with due date-based objectives
- Integration of scheduling and advanced process control in semiconductor manufacturing: review and outlook
- Semiconductor manufacturing automation
- An interactive scheduler for a wafer probe centre in semiconductor manufacturing
- Selection of dispatching rules on multiple dispatching decision points in real-time scheduling of a semiconductor wafer fabrication system
- Dynamic state-dependent dispatching for wafer fabrication
- The infrastructure of the timed EOPNs-based multiple-objective real-time scheduling system for 300 mm wafer fab
- Scheduling algorithms for a semiconductor probing facility
- Hybrid ASP-based multi-objective scheduling of semiconductor manufacturing processes
- A simulation optimization framework to solve stochastic flexible job-shop scheduling problems -- case: semiconductor manufacturing
- Flow shops with reentry: the total weighted completion time objective
- Fifty years of research in scheduling -- theory and applications
- Optimal unrestricted dynamic stochastic scheduling with partial losses of work due to breakdowns
- Vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first
- Multiple-objective scheduling and real-time dispatching for the semiconductor manufacturing system
This page was built for publication: Semiconductor manufacturing scheduling and dispatching
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5479463)