Shared processor scheduling
From MaRDI portal
Abstract: We study the shared processor scheduling problem with a single shared processor where a unit time saving (weight) obtained by processing a job on the shared processor depends on the job. A polynomial-time optimization algorithm has been given for the problem with equal weights in the literature. This paper extends that result by showing an optimization algorithm for a class of instances in which non-decreasing order of jobs with respect to processing times provides a non-increasing order with respect to weights --- this instance generalizes the unweighted case of the problem. This algorithm also leads to a -approximation algorithm for the general weighted problem. The complexity of the weighted problem remains open.
Recommendations
Cites work
- A new continuous model for job-shop scheduling
- Approximation algorithms for multi-agent scheduling to minimize total weighted completion time
- Decentralized subcontractor scheduling with divisible jobs
- Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs
- Multiagent scheduling. Models and algorithms
- Shared multi-processor scheduling
Cited in
(3)
This page was built for publication: Shared processor scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2317136)