Single facility sequencing with variable processing times and costs
From MaRDI portal
Recommendations
- Single-machine sequencing with controllable processing times
- scientific article; zbMATH DE number 4079152
- The Single Machine Problem with a Quadratic Cost Function of Completion Times
- A survey of results for sequencing problems with controllable processing times
- Technical Note—There are No Undiscovered Priority Index Sequencing Rules for Minimizing Total Delay Costs
Cited in
(5)- Sequencing to minimize the maximum renewal cumulative cost
- A sequencing problem in the weaving industry
- An adaptive TS approach to JIT sequencing with variable processing times and sequence-dependent setups
- scientific article; zbMATH DE number 3845324 (Why is no real title available?)
- The Single Machine Problem with a Quadratic Cost Function of Completion Times
This page was built for publication: Single facility sequencing with variable processing times and costs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4239676)