The Single Machine Problem with a Quadratic Cost Function of Completion Times
From MaRDI portal
Recommendations
- Note—On the Single Machine Scheduling Problem with Quadratic Penalty Function of Completion Times: An Improved Branching Procedure
- scientific article; zbMATH DE number 4033468
- Numerical Methods for Single Machine Scheduling with Non-linear Cost Functions to Minimize Total Cost
- Single facility sequencing with variable processing times and costs
- Publication:3481474
Cited in
(17)- Solution of the generalized Townsend single machine scheduling model
- Minimizing the weighted sum of squared tardiness on a single machine
- Minimizing non-decreasing separable objective functions for the unit-time open shop scheduling problem
- Minimizing the sum of squares lateness on a single machine
- The weighted common due date single machine scheduling problem revisited
- scientific article; zbMATH DE number 3845324 (Why is no real title available?)
- scientific article; zbMATH DE number 3864980 (Why is no real title available?)
- scientific article; zbMATH DE number 4033468 (Why is no real title available?)
- Single facility sequencing with variable processing times and costs
- scientific article; zbMATH DE number 527370 (Why is no real title available?)
- scientific article; zbMATH DE number 713581 (Why is no real title available?)
- Note—On the Single Machine Scheduling Problem with Quadratic Penalty Function of Completion Times: An Improved Branching Procedure
- An experimental and analytical study of order constraints for single machine scheduling with quadratic cost
- Numerical Methods for Single Machine Scheduling with Non-linear Cost Functions to Minimize Total Cost
- Single machine quadratic penalty function scheduling with deteriorating jobs and group technology
- Parametric precedence relations in single machine scheduling
- A scheduling problem with job values given as a power function of their completion times
This page was built for publication: The Single Machine Problem with a Quadratic Cost Function of Completion Times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3815117)