Single machine serial-batching scheduling with controllable setup time and job processing times
From MaRDI portal
Recommendations
- Single machine serial-batching scheduling with independent setup time and deteriorating job processing times
- Serial-batching scheduling with time-dependent setup time and effects of deterioration and learning on a single-machine
- Single machine serial-batching scheduling with independent setup time and linear deteriorating jobs
- Scheduling deteriorating jobs on a single serial-batching machine with multiple job types and sequence-dependent setup times
- Batch scheduling with controllable setup and processing times to minimize total completion time
Cited in
(6)- Single machine serial-batching scheduling with independent setup time and deteriorating job processing times
- Single-machine batch scheduling with job processing time compatibility
- Single machine serial-batching scheduling with independent setup time and linear deteriorating jobs
- scientific article; zbMATH DE number 5630568 (Why is no real title available?)
- Serial-batching scheduling with time-dependent setup time and effects of deterioration and learning on a single-machine
- Optimal control strategies for single-machine family scheduling with sequence-dependent batch setup and controllable processing times
This page was built for publication: Single machine serial-batching scheduling with controllable setup time and job processing times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3180981)