Batch scheduling with controllable setup and processing times to minimize total completion time
From MaRDI portal
Recommendations
- Batch scheduling of identical jobs with controllable processing times
- Single machine batch scheduling with jointly compressible setup and processing times.
- Single machine batch scheduling problem to minimize makespan with controllable setup and jobs processing times
- Batch-processing scheduling with setup times
- Single machine batch scheduling to minimize total completion time and resource consumption costs
Cited in
(17)- Single machine batch scheduling with jointly compressible setup and processing times.
- Batch-processing scheduling with setup times
- Batch scheduling to minimize total completion time
- Min-max controllable risk problems
- Single-machine batch scheduling to minimize the total setup cost in the presence of deadlines
- Single machine batch scheduling problem to minimize makespan with controllable setup and jobs processing times
- A survey of scheduling with controllable processing times
- Integrated batch sizing and scheduling on a single machine
- A survey of scheduling problems with setup times or costs
- Single machine serial-batching scheduling with controllable setup time and job processing times
- Batch scheduling of identical jobs with controllable processing times
- scientific article; zbMATH DE number 5630568 (Why is no real title available?)
- ‘Anticipatory batch insertion’ to mitigate perceived processing risk
- Min‐sum controllable risk problems with concave risk functions of the same value range
- A note on optimization in deteriorating systems using scheduling problems with the aging effect and resource allocation models
- Considering manufacturing cost and scheduling performance on a CNC turning machine
- Optimal control strategies for single-machine family scheduling with sequence-dependent batch setup and controllable processing times
This page was built for publication: Batch scheduling with controllable setup and processing times to minimize total completion time
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4679627)