Single machine batch scheduling problem to minimize makespan with controllable setup and jobs processing times
DOI10.3934/NACO.2015.5.71zbMATH Open1309.90028OpenAlexW2327547880MaRDI QIDQ2340165FDOQ2340165
Authors: Chengxin Luo
Publication date: 16 April 2015
Published in: Numerical Algebra, Control and Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3934/naco.2015.5.71
Recommendations
- Single machine batch scheduling to minimize total completion time and resource consumption costs
- Batch scheduling with controllable setup and processing times to minimize total completion time
- Single machine scheduling problem with controllable processing time and setup under convex resource consumption costs
- Single machine batch scheduling with resource dependent setup and processing times
- Single machine batch scheduling with jointly compressible setup and processing times.
Deterministic scheduling theory in operations research (90B35) Applications of operator theory in optimization, convex analysis, mathematical programming, economics (47N10)
Cites Work
- Scheduling with batching: A review
- A survey of scheduling with controllable processing times
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Single machine batch scheduling with resource dependent setup and processing times
- A note on optimization in deteriorating systems using scheduling problems with the aging effect and resource allocation models
Cited In (13)
- Batch delivery scheduling with discretely controllable processing times
- Single machine scheduling problem with controllable processing time and setup under convex resource consumption costs
- Single machine scheduling with batch set-up times to minimize maximum lateness
- Single machine batch scheduling with jointly compressible setup and processing times.
- Single machine batch scheduling problem with family setup times and release dates to minimize makespan
- Single machine batch scheduling to minimize total completion time and resource consumption costs
- Optimal control strategies for single-machine family scheduling with sequence-dependent batch setup and controllable processing times
- Batch scheduling of identical jobs with controllable processing times
- Minimizing makespan in batch machine scheduling
- Makespan optimization in a single-machine scheduling problem with dynamic job ready times-complexity and algorithms
- Batch scheduling with controllable setup and processing times to minimize total completion time
- Scheduling a batching machine with convex resource consumption functions
- Single machine batch scheduling problem with resource dependent setup and processing time in the presence of fuzzy due date
This page was built for publication: Single machine batch scheduling problem to minimize makespan with controllable setup and jobs processing times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2340165)