MineLib
From MaRDI portal
Software:19499
No author found.
Related Items (18)
Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining ⋮ Aggregation heuristic for the open-pit block scheduling problem ⋮ A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: an application to the open-pit mine block sequencing problem ⋮ Evolutionary approach for large-scale mine scheduling ⋮ A Decomposition-Based Heuristic for Collaborative Scheduling in a Network of Open-Pit Mines ⋮ A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines ⋮ Optimizing high-level nuclear waste disposal within a deep geologic repository ⋮ Production Scheduling for Strategic Open Pit Mine Planning: A Mixed-Integer Programming Approach ⋮ Tailored Lagrangian relaxation for the open pit block sequencing problem ⋮ A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling ⋮ Solution procedures for block selection and sequencing in flat-bedded potash underground mines ⋮ A local branching heuristic for the open pit mine production scheduling problem ⋮ Linear models for stockpiling in open-pit mine production scheduling problems ⋮ Combined optimisation of an open-pit mine outline and the transition depth to underground mining ⋮ Comparative analysis of three metaheuristics for short-term open pit block sequencing ⋮ MIRPLib -- a library of maritime inventory routing problem instances: survey, core model, and benchmark results ⋮ A new model for automated pushback selection ⋮ Hierarchical Benders Decomposition for Open-Pit Mine Block Sequencing
This page was built for software: MineLib