The three-machine flowshop scheduling problem to minimise maximum lateness with separate setup times (Q1000165)

From MaRDI portal
scientific article
Language Label Description Also known as
English
The three-machine flowshop scheduling problem to minimise maximum lateness with separate setup times
scientific article

    Statements

    The three-machine flowshop scheduling problem to minimise maximum lateness with separate setup times (English)
    0 references
    0 references
    5 February 2009
    0 references
    Summary: We address the three-machine flowshop scheduling problem to minimise maximum lateness, where setup times are considered separate from processing times. We establish a dominance relation for the problem where it specifies which of the two adjacent jobs should precede in an optimal solution. Moreover, we propose three heuristics: Earliest Due Date (EDD), an Enhanced Earliest Due Date (EEDD) and a Polynomial Genetic-based Algorithm (PGA). We conduct computational analysis on randomly generated problems to evaluate the performance of the proposed heuristics. The analysis shows that the performance of EEDD is acceptable if the computational time is of the main concern and the number of jobs are large. The analysis also shows that PGA significantly outperforms EDD and EEDD.
    0 references
    0 references
    dominance relation
    0 references
    heuristics
    0 references
    setup times
    0 references
    operational research